IBM TotalStorage SAN Volume Controller Installation Manual page 79

Table of Contents

Advertisement

2
latch-lock
3
latch-lever
6. Put your index finger against the side of the latch lever
against the front of the latch lock
7. Gently push the latch lock
3
towards the front of the rail. The latch-lock carrier assembly slides against
the spring tension.
8. Release the latch lock and continue to slide the latch-lock carrier for
approximately 13 mm (0.5 in). The latch lever engages in a hole in the back
bracket assembly and holds the latch-lock carrier in the retracted position.
9. Place the front end of the left rail in the rack cabinet. Align the top of the front
1
bracket
(Figure 25) with the required EIA marking that is on the rack.
2
1
Figure 25. Installing the front end of the rail
1
front bracket
2
rack-mounting flange
3
locating pins
10. Align the locating pins
2
.
11. Push the latch lock
carrier. The latch-lock carrier slides toward the front of the rack, and the
locating pins project through the holes that are in the front flange and in the
front rail bracket.
Chapter 3. Installing the uninterruptible power supply and the SAN Volume Controller
2
.
2
away form the rail as you move the latch-lever
3
3
with the holes that are in the rack-mounting flange
2
(Figure 26 on page 50) away from the rail to release the
3
and your thumb
49

Advertisement

Table of Contents
loading

Table of Contents