IBM TotalStorage SAN Volume Controller Installation Manual page 78

Table of Contents

Advertisement

Figure 23. Opening the front latch-lock carrier assembly
Figure 24. Opening the back latch-lock carrier assembly
48
IBM TotalStorage SAN Volume Controller: Installation Guide
2
latch-lock
3. Gently push the latch lock
1
latch lever
towards the far end of the rail. The latch-lock carrier assembly
slides against the spring tension.
1
1
1
latch-lever
2
latch-lock
4. Continue to slide the latch-lock carrier for approximately 13 mm (0.5 in). The
latch-lever engages a hole in the back bracket assembly and holds the
latch-lock carrier in the retracted position.
5. Push the back rail bracket
stops. The rail is now at its shortest adjustment.
3
2
1
back rail bracket
2
(Figure 23) away from the rail as you move the
2
2
1
(Figure 24) toward the front of the rail until it
Front
1

Advertisement

Table of Contents
loading

Table of Contents