IBM TotalStorage SAN Volume Controller Installation Manual page 66

Table of Contents

Advertisement

Figure 10. Installing support rails for a uninterruptible power supply into the rack
Perform the following steps to install each support rail:
36
IBM TotalStorage SAN Volume Controller: Installation Guide
1
1
Mounting screws
2
Wing nuts
3
Wing nut
4
Nut clips
5
Mounting screws
Attention:
In order to tighten wing nuts
above the rails. Ensure that the support rails are installed before anything is
installed in the 8 EIA units above the rails. If there are devices already installed
in that space, it might be necessary to remove them before installing the rails.
4
1. Attach nut clips
to the rack. These nut clips must align with the second and
fourth holes of the support rail flange.
3
2
2
and
4
5
3
, you will need access from