IBM TotalStorage SAN Volume Controller Installation Manual page 64

Table of Contents

Advertisement

Perform the following steps to prepare for installation:
1. Check all the parts and quantities against the items shown in Figure 9. If any
Figure 9. Items for installation in the rack
2. If you are installing uninterruptible power supplies, read through the safety and
34
IBM TotalStorage SAN Volume Controller: Installation Guide
item is missing, contact your marketing representative.
1
5
3
1
SAN Volume Controller
2
SAN Volume Controller support rails (2)
3
Uninterruptible power supply (2)
4
Uninterruptible power supply rail kit
5
Power and signal cable
environmental notices.
Note: If you are installing the SAN Volume Controller into a rack that already
contains other SAN Volume Controller and uninterruptible power
supplies, the installed uninterruptible power supplies might have spare
capacity. If the customer intends to use that spare capacity, the SAN
Volume Controller that you are going to install might have been delivered
without uninterruptible power supplies.
Related tasks
"Installing the support rails for the uninterruptible power supply" on page 35
You must install the support rails in the rack before installing the uninterruptible
power supply (UPS) 5115 or the uninterruptible power supply (UPS) 5125.
"Installing the support rails for the SAN Volume Controller" on page 47
The support rails should be installed to hold the SAN Volume Controller.
Related reference
"Danger notices for the uninterruptible power supply" on page xvi
Ensure that you understand the danger notices for the uninterruptible power
supply (UPS).
2
(X2)
4
3
(X2)

Advertisement

Table of Contents
loading

Table of Contents