Adjusting The Timing Of The Hook On This Side - JUKI MOL-254 Engineer's Manual

2-needle, automatic belt-loop attaching machine
Hide thumbs Also See for MOL-254:
Table of Contents

Advertisement

Standard Adjustment

6) Adjusting the timing of the hook on this side

The timing of the hook on this side and that of the hook on far side should be adjusted so that the
respective hooks invert simultaneously at the time of catching the thread.
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents