JUKI MOL-254 Engineer's Manual page 151

2-needle, automatic belt-loop attaching machine
Hide thumbs Also See for MOL-254:
Table of Contents

Advertisement

7
10
6. Install fullness base asm.
belt loop removing base
receiver, and temporarily fix it from the top surface
with screws
7. Fix the fullness base asm. after adjusting so that
fullness lever
loop catch (front)
8. Loosen the fixing screw in the device solenoid valve
unit, separate the solenoid valve in the direction of
the arrow mark, and assemble the solenoid valve
for fullness.
(Assemble the solenoid valve in the 7th position.)
At this time, securely insert the rubber ring supplied
as accessory to the solenoid valve. Otherwise, air
leakage will result.
9. Put the stop plug on port A.
10. Connect the connector "VL9" from the solenoid
valve cable asm. to the solenoid valve for fullness.
11. Insert the air pipe into port B and connect it to the
speed controller of fullness cylinder.
Fix the air pipe together with other air pipes with
the cable clip band.
12. Turn ON the lower DIP SW No. 3 located on the
1
right side of operation box panel.
13. Check the speed controller of fullness cylinder.
(For the standard adjustment value, give six turns
after fully opened.)
14. Finally, enter the data value to "1H>" on the panel
to complete the operation.
144
on the rear face of
from under the belt
.
is placed almost in the enter of
and loop catch (rear)
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents