C593_Sub-C Board; Releasing Ffc; C593_Sub-C Board Connector Locations - Epson Stylus Pro 4400 Service Manual

Hide thumbs Also See for Stylus Pro 4400:
Table of Contents

Advertisement

EPSON Stylus Pro 4400/4450/4800/4880/4880C

4.2.4.5 C593_SUB-C Board

1.
Remove "Cover, Side, Left" (p216).
2. Release the FFC from the three clamps.
3. Disconnect all connectors/harnesses on the "C593_SUB-C Board".
Table 4-8. Connectors/Harnesses Connected to C593_SUB-C Board
Connection
Connector
Color/
Order
No.
Mark
1
CN38
MB
2
CN40
C
3
CN41
M
4
CN44
Y
5
CN201
-
6
CN200
-
7
CN24
White
8
CN37
Black
9
CN30
Yellow
10
CN28
White
11
CN32
Red
Note 1: Refer to
Figure 4-47
for connector positions.The CN 45 is not used.
2: When connecting harnesses to the C593_SUB-C Board, connect them in the
order shown in
Table
4-8.
Each "Harness, CSIC" (CN38, CN40, CN41, CN44) is marked
with its corresponding ink name. Refer to
connect the harnesses properly.
Disassembly & Assembly
Number
Connection Socket
of Pins
7
CSIC_L1 Board (Matte Black)
7
CSIC_L2 Board (Cyan)
7
CSIC_L3 Board (Magenta)
7
CSIC_L4 Board (Yellow)
28
C593 MAIN Board (CN53)
15
C593 MAIN Board (CN52)
4
PF Linear Encoder Sensor
2
I/H Lever Sensor (Left)
3
ASF Phase Sensor
2
Paper Eject Phase Sensor
3
PG Phase Sensor
Table 4-8
and
Ink Names
Disassembly Procedures
Clamps
Figure 4-46. Releasing FFC
CN28
CN32
CN30
CN200
CN201
CN44
CN41
Figure 4-47. C593_SUB-C Board Connector Locations
Revision C
FFC
CN37
CN24
CN45
CN38
CN40
238

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents