Perform Engine Maintenance - Genie Z-34/22 Service Manual

Bi-energy power
Hide thumbs Also See for Z-34/22:
Table of Contents

Advertisement

Service Manual
Checklist E Procedures
E-3

Perform Engine Maintenance

Engine specifications require that this procedure be
performed every 2000 hours.
• Radiator coolant (L.L.C.) - replace
• Battery - replace
• Radiator hoses and clamp bands - replace
• Fuel pipes and clamp bands - replace
• Intake air line - replace
Required maintenance procedures and additional
engine information are available in the following
Operator and Maintenance manuals.
Kubota - Z482-E
Genie part number
54
E-4
Perform Engine Maintenance
Engine specifications require that this procedure be
performed every 3000 hours.
• Turbo charger - check
• Injection pump - check
• Fuel injection timing - check
Required maintenance procedures and additional
engine information are available in the following
Operator and Maintenance manuals.
Kubota - Z482-E
Genie part number
52958
Z-34/22 Bi-Energy
April 2016
52958
Part No. 139234

Advertisement

Table of Contents
loading

Table of Contents