Perform Engine Maintenance - Genie Z-34/22 Service Manual

Bi-energy power
Hide thumbs Also See for Z-34/22:
Table of Contents

Advertisement

Service Manual
Checklist C Procedures
C-3

Perform Engine Maintenance

Engine specifications require that this procedure be
performed every 500 hours.
• Air cleaner element - replace
• Fan belt - replace
• Cleaning of water jacket (radiator interior)
• Removal of sediment in fuel tank
• Recharging battery
• Damage in electric wiring and loose
connections - check
Required maintenance procedures and additional
engine information are available in the following
Operator and Maintenance manuals.
Kubota - Z482-E
Genie part number
44
C-4
Perform Engine Maintenance
Engine specifications require that this procedure be
performed every 800 hours.
• Valve clearance - check
Required maintenance procedures and additional
engine information are available in the following
Operator and Maintenance manuals.
Kubota - Z482-E
Genie part number
52958
Z-34/22 Bi-Energy
April 2016
52958
Part No. 139234

Advertisement

Table of Contents
loading

Table of Contents