15.5.2
Chronological sequence
Reference point approach with incremental measuring systems can be divided into three phases:
•
Phase 1: Traversing to the reference cam
•
Phase 2: Synchronization with the zero mark of the position measuring system (encoder zero mark)
•
Phase 3: Traversing to the reference point
Figure 15-2
Time sequence when referencing with incremental measuring systems (example)
Basic Functions
Function Manual, 09/2011, 6FC5397-0BP40-2BA0
15.5 Referencing with incremental measurement systems
R1: Reference point approach
1207