Installation
4.2 Installing gauge and absolute pressure versions
Lay the pressure tubing with a constant gradient to the pressure tapping point, so that any
condensate produced can drain in the main line and thereby avoid corruption of the
measured values.
Installation configuration for vapor and liquid
Install the transmitter below the pressure tapping point.
Lay the pressure tubing with a constant gradient to the pressure tapping point so that any
gas pockets can escape in the main line.
See also
Introduction to commissioning (Page 8-2)
4.2.2

Installation for gauge and absolute pressure

Notice
When installing the process connection of the pressure transmitter, do not turn it on the
housing.
Procedure
To install the transmitter for pressure or absolute pressure, proceed as follows:
Attach the transmitter to the process connection with an appropriate tool.
See also
Introduction to commissioning (Page 8-2)
4-4
SITRANS P300 with HART communication
Operating Instructions, 06/2005, A5E00359579-02