Singer 560 Operation Manual page 94

Hide thumbs Also See for 560:
Table of Contents

Advertisement

A
®
Half-Pitch Lever ...................................
H
@
Swing I
ndicator .................................... 5
@
Pile Levers
(left & right) ........ .............. upper position
*
*If
Pile
Levers are at lower position push it up so
as the distance between Knitter and Ribber is
narrowed.
3.
Using
the straight edge of Needle Pusher push the same
number of needles on Knitter and Ribber to 0 position.
0
0
0
0 0 0 0
4. Move Carriage
2-3
times to align needles in B position
and leave
Carriage
at the right.
@
••••
•••
Q
E~····························
I
D
O
~
s............................
l:;;III
~
••••
• • • I l l
OOL~
L
[]Br
f-
5. Thread
four yarns of different colours into Auto-Tension.
Guide the yarns as illustrated and designate the yarns
as
A, B,
C and 0 from the left.
t
Hook
the yarn A in Yarn Clip, this yarn is to be
@
threaded into Yarn Feeder.
1
-
90
-
Tie the ends of other yarns, B, C, and 0 as illustrated.
Adjust Tension Dial
according to the thickness of yarn
as shown in the
diagram.
Kind of
yarns
Tension
Dial
Light
yarn
4-5
Thin
yarn
5-6
If
different
thickness
of yarns
are used
together,
adjust
the Tension Dial to maintain
the
distance
(@)
between
the tip
of
the Tension
Spring to
the top
of
Auto-
Tension
within
10-30cm.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents