Removing Oil Pump Chain Temporary Link; Installing New Riveted Link; Installing Assembly Inserts Into Riveting Tool - Mercedes-Benz 2005 Sprinter Service Manual

Table of Contents

Advertisement

VA
OIL PUMP (Continued)
Fig. 56 REMOVING OIL PUMP CHAIN TEMPORARY
1 - NEW OIL PUMP CHAIN
2 - OLD OIL PUMP CHAIN
3 - TEMPORARY LINK
Fig. 57 INSTALLING NEW RIVETED LINK
1 - NEW RIVETED LINK
2 - OIL PUMP CHAIN
(5) Assemble riveting tool by attaching inserts.
(Fig. 58).
LINK
Fig. 58 INSTALLING ASSEMBLY INSERTS INTO
RIVETING TOOL
1 - SPECIAL TOOL #8947
2 - SPECIAL TOOL #8952
NOTE: The outer plate will be held in place by a
magnet.
(6) Place new outer plate into tool insert.
NOTE: Ensure that the riveted link and riveting tool
are aligned.
(7) Position riveting tool over new link and press
in new rivet as far as the tool stop.
(8) Remove riveting tool to change inserts.
(9) Install insert on riveting tool and secure with
screw.
(10) Install insert on riveting tool (Fig. 59).
NOTE: The outer plate is held in place magnetically
by riveting tool.
(11) Insert new outer plate into the moving assem-
bly insert.
(12) Position riveting tool so that spacer webs of
the guide are side by side.
(13) Ensure that riveted link and outer plate are
aligned.
NOTE: When turning spindle of riveting tool, be
sure that pins of riveted link are inserted into holes
of outer plate.
(14) Screw in spindle of riveting tool until firm
resistance is felt.
(15) Remove riveting tool.
(16) Turn over tool moving assembly insert to the
riveting profile.
ENGINE 9 - 55

Advertisement

Table of Contents
loading

Table of Contents