Process control is done only if the following conditions are met.
The counter (SP3-510) is reset if a self-check is done (except for
a forced self-check):
•
Initial
−
And BW Counter (SP3-510-003) ≥
FC Counter (SP3-510-004) ≥ Execution Interval Setting (SP3-511-006)
−
Or Non-use Time ≥ Setting (SP3522-002: 6 hours)
−
Or ΔT ≥ Temperature Range (SP3-522-003: 10°C)
−
Or ΔRH ≥ Relative Humidity Range (SP3-522-004: 50%RH )
−
Or ΔAH ≥ Absolute Humidity Range (SP3-522-005: 6 g/m
•
Job End
−
BW Counter (SP3-510-001) ≥
Counter (SP3-510-002) ≥ Execution Interval Setting (SP3-515-002)
More On Process Control
Execution Interval Setting (SP3-511-005) or
Execution Interval Setting (SP3-515-001) or FC
3
)
108
108