Table Of Contents - York YHGS Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

Please read this installation
manual carefully before starting
the installation. It will tell you
necessary information.
Quality POLICY
We
will
continuously
to satisfy our customers with
consistent reliability in product,
service and support through
superior quality, service culture
and distinctive technology.
2
ENGLISH
CONTENTS
1
1.1 Refrigerant ......................................................................... 3
1.2 Electrical connection ......................................................... 3
1.3 Commissioning .................................................................. 3
2
Heat pump information ..............................................4
2.1 Geysir & Geysir with Passive cooling ............................... 4
2.2 Geysir Air ........................................................................... 7
2.3 Installation package contents ............................................ 9
2.4 Heat pump control panel ................................................... 10
2.5 Transporting the heat pump .............................................. 10
2.6 Space requirement ............................................................ 10
2.7 Recommended location ..................................................... 10
3
Drilling holes for brine lines ......................................11
4
Separating the heat pump .........................................12
5
Unpacking and installation ........................................13
5.1 Setting up ............................................................................ 13
5.2 Removing the front cover....................................................... 13
6
Piping installation .......................................................15
6.1 VL System ......................................................................... 15
6.2 VLD sytem: Geysir Air ....................................................... 16
6.3 Safety valves ..................................................................... 16
6.4 Connecting cold and hot water pipes ................................ 16
6.7 Bleeding the heating system ............................................. 17
7
Electrical installation ..................................................17
7.1 Connect power supply, 400V 3N....................................... 18
7.2 Connect power supply, 230V 1N SP ................................. 18
7.3 Position and connect outdoor sensors .............................. 18
7.5 Resetting to system VLD ................................................... 19
7.7 Connecting the outdoor unit, Geysir Air ............................ 19
7.8 Connect defrost sensor, Geysir Air ................................... 19
8
Brine installation .........................................................20
8.2 Information collector pipe .................................................. 21
8.3 Connection to outdoor unit ................................................ 21
8.4 Connection of several brine coils ...................................... 21
8.5 Connection diagram .......................................................... 22
8.6 Installing brine lines ........................................................... 22
8.7 Filling the brine system ..................................................... 23
8.8 Bleeding the brine circuit ................................................... 24
8.9 Vent outdoor unit, Geysir Air ............................................. 24
9
9.1 Room temperature sensor................................................. 25
9.2 EVU Function .................................................................... 25
9.3 Tariff control ..................................................................... 25
9.4 Flow switch/level switch .................................................... 26
strive
9.5 Higher hot water temperature ........................................... 26
10 Start up ........................................................................26
10.1 Installation checklist ......................................................... 26
10.2 Manual test ........................................................................ 27
10.3 Commissioning .................................................................. 28
10.4 Installing the front cover .................................................... 28
10.5 After start up ...................................................................... 28
11 Customer information ................................................29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ypgs

Table of Contents