Unpacking And Installation; Setting Up; Removing The; Unpacking And Installing Outdoor Unit Geysir Air - York YHGS Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

5. UNPACKING AND INSTALLATION

5.1. SETTING UP

The heat pump has feet that can be adjusted 20 mm to
l
compensate for irregularities in the surface on which it is sitting.
If the surface is so irregular that the feet cannot compensate for
it, the installation engineer must remedy this.
It is recommended that a condensation drain be installed from
l
the drain pipe of the drip tray while the heat pump is on its side.
The drain pipe opens through a hole in the base plate and has a
Ø 10 mm hose connection.
1.
Move the heat pump to the installation site. If there is little
space the heat pump can be separated according to the section
"Separating the heat pump".
2.
Remove the packaging.
Figure 18: Condensation drain connection
3.
Install a condensation drain on the connection in the base plate
if required.
4.
Set up the heat pump in the installation site.
Figure 19: Adjusting the heat pump.
5.
Adjust the feet so that it is horizontal.
5.2. REMOvING THE FRONT COvER
NOTE! Do not damage the electrical wiring for the
!
control computer when the front cover is removed!
To install the heat pump the front cover must be removed.
Figure 20: Removing the front cover.
1.
Hold the front panel with one hand and turn the catch 90°
anticlockwise to detach the front panel.
3.
Tilt the front cover outwards.
4.
Lift the front cover upwards to remove it from the heat pump.
5.3. UNPACkING AND INSTALLING OUTDOOR
UNIT GEYSIR AIR
Applies to Geysir Air.
The outdoor unit is packed and delivered in a crate.
1.
Start by unpacking the unit from the crate.
2.
Check that the delivery is complete, it must contain the outdoor
unit, front cover, cover as well as a disassembled stand including
necessary screws, nuts and washers.
Assembling the stand
1.
Screw the two horizontal struts together (1) using the two ends
(2) as illustrated below. Use 8 x M6x10 screws. The curved
edges of the horizontal struts must be facing upwards and
inwards.
Rebord
2
Encoche
3
Figure 21: Assembling the stand.
2.
Screw the adjustable feet (3) into the holes under the ends.
2
Encoche
1
1
3
13
ENGLISH
EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ypgs

Table of Contents