Figure 47: Removing The Dust Cover From The Sfp Module; Figure 48: Positioning The Sfp Handle In The Upright Position - Allied Telesis AT-8100S/24C Installation Manual

Fast ethernet switches
Hide thumbs Also See for AT-8100S/24C:
Table of Contents

Advertisement

Chapter 7: Cabling the Network Ports
Figure 47. Removing the Dust Cover from the SFP Module
6. Verify that the handle on the SFP transceiver is in the upright position,
as shown in Figure 48.
SFP Handle
Figure 48. Positioning the SFP Handle in the Upright Position
108

Advertisement

Table of Contents
loading

Table of Contents