Motorola AP-7131N-FGR Installation Manual page 7

Hide thumbs Also See for AP-7131N-FGR:
Table of Contents

Advertisement

Introduction
3
• Assign installation responsibility to the appropriate personnel.
• Identify and document where all installed components are located.
• Provide a sufficient number of power drops for your equipment.
• Ensure adequate, dust-free ventilation to all installed equipment.
• Identify and prepare Ethernet and console port connections.
• Verify cable lengths are within the maximum allowable distances for optimal signal
transmission.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents