Motorola AP-7131N-FGR Installation Manual page 23

Hide thumbs Also See for AP-7131N-FGR:
Table of Contents

Advertisement

5. Create a light pipe path hole in the target position on the ceiling tile.
6. Use a drill to make a hole in the tile the approximate size of the access point LED light pipe.
CAUTION
7. Remove the light pipe's rubber stopper (from the access point) before installing the light
pipe.
8. Connect the light pipe to the bottom of the access point. Align the tabs and rotate
approximately 90 degrees. Do not over tighten.
9. Fit the light pipe into hole in the tile from its unfinished side.
10. Place the decal on the back of the badge and slide the badge onto the light pipe from the
finished side of the tile.
11. Attach the antennas to their correct connectors.
For information on the antennas available to the access point, see
6.
CAUTION
Motorola Solutions recommends care be taken not to damage the
finished surface of the ceiling tile when creating the light pipe hole
and installing the light pipe.
Ensure you are placing the antennas on the correct connectors to
ensure the successful operation of the AP-7131N-FGR access point.
Hardware Installation
Antenna Options on page
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents