Motorola AP-7131N-FGR Installation Manual page 24

Hide thumbs Also See for AP-7131N-FGR:
Table of Contents

Advertisement

20
Motorola Solutions AP-7131N-FGR Access Point Installation Guide
12. Motorola Solutions recommends attaching safety wire to the access point safety wire tie
point or security cable (if used) to the access point's lock port.
13. Align the ceiling tile into its former ceiling space.
14. Cable the access point using either the Power Injector solution or an approved line cord and
power supply.
For Motorola Solutions Power Injector installations:
a. Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the network data supply (host)
and the Power Injector Data In connector.
b. Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the Power Injector Data &
Power Out connector and the access point's GE1/POE port.
c. Ensure the cable length from the Ethernet source (host) to the Power Injector and
access point does not exceed 100 meters (333 ft). The Power Injector has no On/Off
power switch. The Power Injector receives power as soon as AC power is applied. For
more information on using the Power Injector, see Power Injector System on page 8.
For standard power adapter (non Power Injector) and line cord installations:
a. Connect a RJ-45 Ethernet cable between the network data supply (host) and the access
point's GE1/POE or GE2 port.
b. Verify the power adapter is correctly rated according the country of operation.
c. Connect the power supply line cord to the power adapter.
d. Attach the power adapter cable into the power connector on the access point.
e. Attach the power supply line cord to a power supply.
CAUTION
15. Verify the behavior of the access point LED light pipe. For more information, see
LED Indicators on page
16. Place the ceiling tile back in its frame and verify it is secure.
17. The access point is ready to configure. For information on basic access point device
configuration, see Configuring "Basic" Device Settings on page 30.
Do not actually connect to the power source until the cabling portion
of the installation is complete.
21.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents