Motorola AP-7131N-FGR Installation Manual page 21

Hide thumbs Also See for AP-7131N-FGR:
Table of Contents

Advertisement

11. Rotate the access point chassis 45 degrees counter-clockwise. The clips click as they fasten
to the T-bar.
12. The access point is ready to configure. For information on basic access point device
configuration, see
NOTE
2.5.3
Above the Ceiling (Plenum) Installations
An above the ceiling installation requires placing the access point above a suspended ceiling and
installing the provided light pipe under the ceiling tile for viewing the rear panel status LEDs of the
unit. An above the ceiling installation enables installations compliant with drop ceilings, suspended
ceilings and industry standard tiles from .625 to .75 inches thick.
Configuring "Basic" Device Settings on page 30.
If the access point is utilizing remote management antennas, a wire
cover can be used to provide a clean finished look to the installation.
Contact Motorola Solutions for more information.
Hardware Installation
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents