Motorola AP-7131N-FGR Installation Manual page 20

Hide thumbs Also See for AP-7131N-FGR:
Table of Contents

Advertisement

16
Motorola Solutions AP-7131N-FGR Access Point Installation Guide
c. Ensure the cable length from the Ethernet source (host) to the Power Injector and
access point does not exceed 100 meters (333 ft). The Power Injector has no On/Off
power switch. The Power Injector receives power as soon as AC power is applied. For
more information, see
For standard power adapter (non Power Injector) and line cord installations:
a. Connect a RJ-45 Ethernet cable between the network data supply (host) and the access
point's GE1/POE or GE2 port.
b. Verify the power adapter is correctly rated according the country of operation.
c. Connect the power supply line cord to the power adapter.
d. Attach the power adapter cable into the power connector on the access point.
e. Attach the power supply line cord to a power supply.
CAUTION
6. Verify the behavior of the access point LEDs. For more information, see LED Indicators on
page 21.
7. Align the bottom of the ceiling T-bar with the back of the access point.
8. Orient the access point chassis by its length and the length of the ceiling T-bar.
9. Rotate the access point chassis 45 degrees clockwise.
10. Push the back of the access point chassis on to the bottom of the ceiling T-bar.
Power Injector System on page
Do not actually connect to the power source until the cabling portion
of the installation is complete.
8.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents