(Pos 3) is reached. The resin is flushed
from below upwards. Duration 100 sec-
onds, wastewater 3 – 4.5 litres.
– Then two strokes are performed again,
until the "Initial Filtrate" position (Pos 5)
is reached. Here the resin is flushed
from above downwards. Duration 100
seconds, wastewater 2.5 -4 litres.
– After two further strokes the regenera-
tion is completed. Total duration max. 9
minutes.
– If the measured values significantly differ
from the setpoint values (see chapter
"Service Record Sheet"), the customer
service department must be notified. Al-
ways quote the unit number (28), which
is imprinted in the top of the unit connec-
tion flange.
Before carrying out any work on the soften-
er, which extends beyond pure operational
control, the softener must be depressurised!
Failure to observe this can lead to an uncon-
trolled escape of water and therefore lead to
water damage in the building. Strictly com-
ply with the instructions given in the
"Installation" and "Maintenance" chapters.
Disconnect the power pack from
the socket! (If installed, disconnect
the power pack of the downstream
metering pump too!)
18
Operation
5.5
(see chapter "Safety information and dan-
gers due to non-compliance")
The water supply to the softener is interrupt-
ed. The main tap is closed or the bypass
valve is switched over.
The softener must be stored in a dry, frost-
free place when dismantled. The connecting
flange must be protected against dirt and
damage.
If the softener is refitted and put back into
service, regeneration must always be car-
ried out first (see chapter "Commissioning").
JUDO QUICKSOFT-UNO
Stoppages
ATTENTION
Disconnect the power pack from
the socket! (If installed, disconnect
the power pack of the downstream
metering pump too!)
Need help?
Do you have a question about the QUICKSOFT-UNO and is the answer not in the manual?