Judo PROMI Installation And Operating Instructions Manual
Judo PROMI Installation And Operating Instructions Manual

Judo PROMI Installation And Operating Instructions Manual

Domestic water station

Advertisement

Quick Links

Attention:
Carefully read through the instal-
lation and operating instructions,
as well as all safety information
before installing and putting the
unit into service.
These Instructions must always
be issued to the owner/user.
Installation and Operating
Instructions
JUDO PROMI
Sizes ¾" - 2"
Valid for: EU countries and Switzerland
JPM 1½" – 2"
JPM ¾" – 1¼"

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PROMI and is the answer not in the manual?

Questions and answers

Summary of Contents for Judo PROMI

  • Page 1 Installation and Operating Instructions JUDO PROMI Sizes ¾" - 2" Valid for: EU countries and Switzerland Attention: Carefully read through the instal- lation and operating instructions, as well as all safety information before installing and putting the unit into service.
  • Page 2 • pressure reduction, • and backflow prevention. The JUDO PROMI is suitable for use in Manufacturing COLD water applications only, up to a JUDO Wasseraufbereitung GmbH water temperature of maximum 30 °C Hohreuschstraße 39-41 (86 °F) and up to a water pressure of maximum 16 psi.
  • Page 3 – Do not install this product near acid or acid fumes. – All plumbing MUST conform to local codes. – All plumbing must be properly supported with no stress to be put on product or piping. JUDO PROMI...
  • Page 4 JUDO PROMI...
  • Page 5: Table Of Contents

    All the general safety notes given in this 11. Customer Service......28 instruction manual are to be observed and carried out safely. Failure to do so can result in personal injury and / or property damage. The manufacturer waves all liabilities. JUDO PROMI...
  • Page 6: About This Instruction Manual

    1 bar = 105 Pa = 0,1 N/mm² must always be observed and kept in a fully ¾" 20 mm legible condition. 1" 25 mm 1¼" 32 mm 1½" 38 mm 2" 52 mm Fig. 1: Built-in rotary flange JUDO PROMI...
  • Page 7: Intended Use

    Always check with local authori- ties prior to installations. The filter may only be operated in a techni- cally faultless condition, in accordance with JUDO PROMI...
  • Page 8: Product Information

    Unauthorized persons must not have ac- ments of the DVGW work sheet W270. cess to the filter! Metallic materials fulfill the requirements of DIN 50930-6 (Impact on the Drinking Water ATTENTION Quality). (see chapter “Safety information dangers due to non-compliance”) JUDO PROMI...
  • Page 9 ATTENTION (see chapter “Safety information dangers due to non-compliance”) Always install the filter in a vertical position (± 5°)! Non-observance of this can cause uncon- trolled leakage of backwashing water and can result in water damage. JUDO PROMI...
  • Page 10: Discharging Backwash Water

    Failure to observe this can lead to leaks and overflow. Therefore the bucket must be water escamping. This can in turn cause wa- adequately sized and the backwashing ter damage (see fig.3). should be carried out quickly. Profiled flange gasket Fig. 3: Built-in rotary flange JUDO PROMI...
  • Page 11 > 200 mm (8 inch) (8 inch) min. 10 l min. 10 l > 40 mm > 25 mm (1.5 inch) (1 inch) > 40 mm (1.5 inch) > 25 mm (1 inch) Abb. 4: Backwashing water discharge options JUDO PROMI...
  • Page 12: Operation

    The pressure setting-range is recom- Commissioning mended between 2 psi and 6 psi. – Open a tap downstream of the PROMI Before starting up (initial putting into service as a pressure relief and the set pressure or startup after maintenance work), fill the can be read.
  • Page 13: Function Description

    10 screw cover 3 Guide ring to perform the next backwash 11 Protection Cap – Backflow preventer date 12 Memory Electronic and Battery box 4 Filter housing 5 Pressure reducer 6 Inlet pressure gauge 7 Outlet pressure gauge JUDO PROMI...
  • Page 14: Backwashing

    The smaller the mesh size of the sieve the using the inlet water pressure; ejecting them more frequently backwashing has to be all to drain via the rinsing valve. performed! JUDO PROMI...
  • Page 15: Modifications / Changes / Spare Parts

    5.5.1 Servicing / Repair You can also mark the next backwash date using the adjusting ring under the hand- Prior to servicing or repairing the PROMI. wheel. You must turn off the water supply valve, located upstream of the unit and depres- –...
  • Page 16: Stoppages

    Leaking replacement has been made. water cause major material- damages to the building and personal injury can occur. – When recommissioning the filter, strictly comply with the instructions given in this manual. JUDO PROMI...
  • Page 17: Faults

    “Safety information (see chapter “Safety information dangers due to non-compliance”) dangers due to non-compliance”) only clear, drinking water Always observe the chapter “Intended Use”! concerning the cleaning of the cleaning of the filter and the transparent filter housing. JUDO PROMI...
  • Page 18: Checking The Note Electronics (Only Jpm ¾" - 1¼")

    ATTENTION (see chapter “Safety information dangers due to non-compliance”) To make sure the total interval of two- months is not exceeded, backwash the filter after replacing the batteries. JUDO PROMI...
  • Page 19: Data Sheet

    Data Sheet Data Sheet Weight Type Models Weight JUDO PROMI JPM ¾" 4,9 kg Domestic water station JPM 1" 5,2 kg Abbreviated name: JPM JPM 1¼" 5,6 kg JPM 1½" 17,5 kg Models JPM 2" 18,7 kg Models Order no.
  • Page 20: Installing Dimensions Jpm ¾" - 1¼

    C = Height above pipe centre D = Height below pipe centre E = Depth to pipe centre F = Connection dimension waste water built-in rotary flange horizontal piping built-in rotary flange vertical piping Fig. 6: Installing dimensions JPM ¾" - 1¼" JUDO PROMI...
  • Page 21: Installing Dimensions Jpm 1½" - 2

    – 1 x built-in rotary flange JQE ¾", 1" or 1¼" with bayonet-type connection and screw connection, – 2 x batteries to be used in the Memory Electronic (size AAA). built-in rotary flange vertical piping Fig. 7: Installing dimensions JPM 1½" - 2" JUDO PROMI...
  • Page 22: 10. Spare Parts

    Spare Parts 10. Spare Parts 10.1 JPM " – " ¾ 1¼ JUDO PROMI...
  • Page 23 Filter Screen MW 0.10 mm (0.004 inch) 2010378 O-ring 90x4 **** 1120333 O-ring 6.5x2 **** 1120334 Filter Bottom Piece 2020152 Hexagonal nut M6 1633145 O-ring 6.5x6 1200214 Tube Connection 1120310 Upper Housing Part prints on 2160107 Filter Funnel 1120298 Backflow preventer 1610311 JUDO PROMI...
  • Page 24 0-16 psi (Primary Pressure) 2170120 Hollow screw 1650217 Screwing cover 1120679 Spare part set consisting of Item 13, 15, 16, 17, 19, 20, 21 2010224 Replacement interval: 2 years *** = 3 years **** = 4 years JUDO PROMI...
  • Page 25 Spare Parts 10.2 JPM " " 1½ – 2 JUDO PROMI...
  • Page 26 1607110 Connection Piece 1607154 O-ring 26x3 1607111 O-ring 113.67x5,33 1607112 Filter Bottom Piece 2607102 Profile flange seal 1200230 Hose coupling 1607157 Cylinder Screw M8x30 1607116 O-ring 84x4 1200201 O-ring 38x4 1612131 Cartridge **** 2100004 Upper Housing Part 2150104 JUDO PROMI...
  • Page 27 1200230 Cylinder Screw M8x140 1650376 Washer A 8.4 1607125 Hexagonal nut M8 1607117 Spare part set consisting of Item9, 10, 12, 13, 14, 16, 20 2010225 Replacement interval: 2 years *** = 3 years **** = 4 years JUDO PROMI...
  • Page 28: Customer Service

    Tel. +41 (0) 61 906 40 50 • Fax +41 (0) 61 906 40 59 e-mail: info@judo-online.ch • www.judo-online.ch JUDO Waterbehandeling GmbH • Filiaal / Filiale BeNeLux Laerbeeklaan 72 A1 • 72 A1, Avenue du Laerbeek • B-1090 Brussel/Bruxelles Tel./Tél. +32 (0)24 60 12 88 • Fax +32 (0)24 61 18 85 e-mail: info.benelux@judo.eu •...

This manual is also suitable for:

Jpm

Table of Contents