Windhager LogWIN LWP 180 Assembly Instructions Manual page 24

Wood gasification boiler
Table of Contents

Advertisement

For the Electrician
Electrical cables should be routed in the cable ducts intended for this purpose and are not allowed to
be routed over the cleaning cover. The space above the cover must be accessible for cleaning.
– After connecting the cables, hinge the control panel cover back in (Fig. 47), close and secure with 1 screw at
the front – Fig. 48.
Fig. 47
– Connect the mains power plug at the rear of the control panel – Fig. 49
– Hinge in front boiler cover (Fig. 50) and secure at front again using 2 screws – Fig. 51.
– Insert the pins on the rear boiler cover into the holes provided in the side panel on the boiler – Fig. 52.
Power plug
Fig. 49
Fig. 51
Hinging in control panel cover
Connecting plugs – rear view
Securing 2 screws at the front
Fig. 48
Securing control panel cover
with 1 screw at the front
Fig. 50
Hinging in boiler cover
Fig. 52
Putting on the rear boiler cover
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents