For the Installer
– Hinge in front boiler cover (Fig. 36) and secure to side walls at front using 2 screws – Fig. 37 .
Fig. 36
– Insert the pins on the rear boiler cover into the holes provided in the side panel cladding – Fig. 38.
– Install the hanger with the instructions folder, cleaning and operating implements on a side panel of the boil-
er (Fig. 39) or on a wall in the boiler room/installation room.
– Keep ash pan under boiler.
Fig. 38
Supplied as standard:
–
Folder containing instructions
–
Poker
–
Scratcher
–
Cleaning brush
–
Spatula
–
Ash pan
–
Hanger (for installation on the wall or LogWIN
side panel)
Hinging in boiler cover
Putting on the rear boiler cover
Fig. 37
Securing boiler cover in 2 places
Fig. 39
Fitting hanger, ash pan under boiler
19