Windhager LogWIN LWP 180 Assembly Instructions Manual page 19

Wood gasification boiler
Table of Contents

Advertisement

For the Installer
– Hinge in front boiler cover (Fig. 36) and secure to side walls at front using 2 screws – Fig. 37 .
Fig. 36
– Insert the pins on the rear boiler cover into the holes provided in the side panel cladding – Fig. 38.
– Install the hanger with the instructions folder, cleaning and operating implements on a side panel of the boil-
er (Fig. 39) or on a wall in the boiler room/installation room.
– Keep ash pan under boiler.
Fig. 38
Supplied as standard:
Folder containing instructions
Poker
Scratcher
Cleaning brush
Spatula
Ash pan
Hanger (for installation on the wall or LogWIN
side panel)
Hinging in boiler cover
Putting on the rear boiler cover
Fig. 37
Securing boiler cover in 2 places
Fig. 39
Fitting hanger, ash pan under boiler
19