Windhager LogWIN LWP 180 Assembly Instructions Manual page 13

Wood gasification boiler
Table of Contents

Advertisement

For the Installer
Installation sequence:
– Carefully install the insulation on the top of the boiler – Fig. 8.
– Attach control panel – Fig. 9.
Fig. 8
Fitting top insulation on the boiler
– Thread thermocontrol sensor (green cable) through boiler door rail – Fig. 10.
– Fit front sensor at front above ash door – Fig. 11.
Fig. 10
Threading through thermocontrol sensor
– Fit air control on rear of boiler; hinge in air control at top and secure with screw at bottom – Fig. 12.
– Route cables from air control and lambda sensor upwards at sides and secure to the boiler at the position
of the white/yellow mark on the cable using the cable ties of the same colour – Fig. 13.
The air control cables must be long enough for service purposes and must not be routed around
the connection discharge.
Fig. 12
Hinging in air control at top
and screwing on at bottom
Fig. 9
Attaching control panel
Fig. 11
Installing the thermocontrol sensor
Fastening clips
with white
mark
Fig. 13
Using cable ties to secure cables to the
boiler at the white/yellow marks
13
Fastening clips
with yellow mark

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents