Windhager LogWIN LWP 180 Assembly Instructions Manual page 17

Wood gasification boiler
Table of Contents

Advertisement

For the Installer
– Punch through 2 cut-outs for door hinge at top/bottom from side wall and screw on cladding door – Fig. 26.
– Straighten the side walls by eye using the width of the cladding door and screw down at front bottom/top
using 4 TT self-tapping screws – Fig. 27.
Fig. 26
– Thread cable for Info-WIN from the control panel, sideways through the opening in the side wall and cladding
door – Fig. 28. Cable protection must be in position at the transition between the side wall and door. Use
cable ties to secure cable to the door – Fig. 29.
Fig. 28
– Screw InfoWIN onto cladding door cover – Fig. 30.
– Connect InfoWIN cable with control panel cable – Fig. 31.
Fig. 30
Mounting the cladding door.
Threading in InfoWIN cable
Screwing InfoWIN onto cladding door
cover
Fig. 27
Straightening side walls
Fig. 29
Securing InfoWIN cable with cable
ties at cable protection
Fig. 31
Connecting InfoWIN cables
17
Connecting
cables

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents