Windhager LogWIN LWP 180 Assembly Instructions Manual page 14

Wood gasification boiler
Table of Contents

Advertisement

For the Installer
– Screw both brackets for the cladding door hinges (different hole spacing) onto the boiler door rail at the top
and bottom – Fig. 14.
Note: The brackets for the cladding door can either be screwed on for a door catch on the left or right.
Fig. 14
– Only for LogWIN 360 – 500: Slide connecting bracket cladding under control panel and secure to control panel
with 2 screws – Fig. 15.
– Fit side walls; depending on boiler model, at bottom adjust at base in cuttings (Fig. 18) and at top screw
onto control panel or connecting bracket – Figs. 16, 17, 18.
Fig. 15
Fig. 17
Fitting brackets for door hinge
Sliding connecting bracket under control
panel and screwing on in two places
Screwing down LogWIN 180–300 side
walls with control panel in four places
Cutting for LWP
180–300
LWP 360, 500
Fig. 16
Fig. 18
14
Hooking in side panels at the bot-
tom
Screwing down LogWIN 360, 500 side walls
with connecting bracket in two places

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents