Step 4. Reposition the controller module. Once fully inserted, lift up the
Step 5. Secure the controller module to the subsystem by installing the
Step 6. Re-attach all the cables that were removed. These include the
Step 7. Power up the system.
Replacing Controller Module Components
Chapter 5: Subsystem Maintenance and Upgrading
Figure 5-3: Inserting the Controller Module
levers at the back of the controller module. This will set the
controller module in the correct position.
Figure 5-4: Lifting the Controller Module Latches Upward
two (2) screws on the levers. (See Figure 5-5)
Figure 5-5: Installing the Controller Module Screws
cables that connect to the host and the expansion chassis, any
Ethernet cable that was previously attached to the LAN port, and
any cables that were attached to the COM ports.