Power On; Check List - Uniwide AR3016G Hardware User's Manual

Raid subsystem series
Table of Contents

Advertisement

AR3016G Installation and Hardware Reference Manual

4.4 Power On

Once all of the components have been installed in the AR3016G and the
host channels have been connected to the host, the subsystem can be
powered on.
4.4.1

Check List

BEFORE powering on the AR3016G, please check the following:
4-6
Figure 4-2: Connect AR3016GSubsystem to Single Host
Connections: The input ports on the subsystem, FC-CH0 and FC-
CH1, are connected to two separate HBAs on a host computer.
Memory module: Memory modules have been correctly installed
on the controller boards.
BBU: If BBU is installed, make sure BBU has been installed
correctly.
Hard drives: Hard drives have been correctly installed in the drive
trays.
Drive trays: All the drive trays, whether or not they contain a hard
drive, have been installed into the subsystem.
Cable connections: The host ports on the subsystem have been
correctly connected to a host computer(s).
Power cords: The power cords have been connected to the PSU
modules on the subsystem and plugged into the main power source.
Ambient temperature: All the subsystem components have been
acclimated to the surrounding temperature.
Power On

Advertisement

Table of Contents
loading

Table of Contents