Engine Dismantling - PGO G-MAX 50 Service Manual

Hide thumbs Also See for G-MAX 50:
Table of Contents

Advertisement

(2)Engine Dismantling

A. Dismantling engine.
1.Take off the luggage compartment.
2.Take off the left and right body covers.
3.Take off the lower mudguard fender.
4.Remove vacuum pipe, fuel pipe, auto choke, cap of spark plug, rear
Brake cable carburetor pipe, engine flywheel shelf's nut, starter
Motor cable plate and rear damper bolt.
5.Remove the engine.
B. Installing Engine.
1.To install engine, please reverse the above procedures.
2.Locking torque:
M8: 2.0~3.0kg-m
M10: 3.0~4.0kg-m
M12: 5.0~6.0kg-m
3.After installing, please do the following checking and adjustment:
Checking and adjustment:
a. Wiring connection.
b. Throttle cable and oil control cable.
c. Rear brake adjustment.
d. Fuel and oil route.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents