Contemporary Faceplate Installation - Regency IP28-PROPANE Owners & Installation

Ip28 gas inbuilt
Table of Contents

Advertisement

NOTE: If installing the Contemporary Faceplate with the mock fi replace -
adjust the framing tabs accordingly.
1) Line up faceplate with front of unit.
Install four (4) screws in locations shown below to secure faceplate
2) Hook up wire harness from faceplate to connection to under unit and
check gas connections.
3) Reinstall bottom louver and install 2 screws in locations shown below.
918-972
Regency IP28 Gas Inbuilt Fireplace

CONTEMPORARY FACEPLATE INSTALLATION

CONTEMPORARY FACEPLATE INSTALLATION
4) Re install front frame.
5) Final install.
1
IP28
INSTALLATION
11/24/10
25

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IP28-PROPANE and is the answer not in the manual?

This manual is also suitable for:

Ip28-ngIp28-ulpg

Table of Contents