Install top two 110 mm stand offs to the top of unit.
Install two 67 mm stand offs to the back of unit - install two 55 mm stand offs to the each side of unit.
2)
Install left and right side nailing fl ange.
3)
Lay insulation blanket on top of unit so it is fl ush and tight against backside of faceplate.
4)
Unit is now ready for install into a combustible cavity that has the above mentioned clearances.
NOTE: Please adjust nailing fl anges in relationship to either Contemporary or Low Profi le Faceplate. Faceplate needs to be fl ush against fi nished wall.