MOTO GUZZI V 35 Workshop Manual page 4

Hide thumbs Also See for V 35:
Table of Contents

Advertisement

"
TORQUE LOADINGS
SPECIFIC WORSCHOP TOOLS
Ii
ENGINE UNIT
Removal of engine-gearbox front the frame - Separation of
engine from gearbox
2
Removing the rocker box covers
3
Stripping the cylinder heads
4
Removing the cylinder barrels
5
Removing the compression rings and oil scrapers from the piston
6
Removal of pistons
7
Separating the crankcase covers
8
ReplaCing the seal in timing cover (engine mounted)
9
Dismantling the con-rods
10
Dismantling the crankshaft
11
Removing the flywheel
12
Dismantling the timing group
I,
LUBRICATION
1
Removing tile oil sump
2
Dismantling tile oil pump
3
Removing
the
oil pressure relief valve
4
Oil pressure light switch
5
Removing the oil cartridge front the sump
6
Removing the wire gauge filler from the all sump
CARBURATION
1
Carburettors
2
Carburettor setting
3
Levelling the floater
4
Manual adjuslment of carburation and idling speed
5
Adjusting carburalion using a vacuometer
6
Stripping the carburettor
7
Air filter and breather unit
. : .
CLUTCH
I'
THE GEARBOX
1
Removing the gearbox from the frame and swinging arm
from the gearbox
2
Clutch housing
3
Clutch
4
Gearbox
5
Gearbox cover
6
Gear-shafts assembly
7
Gear selector
pag. 21
pag.
23
pag.
25
pag.
46
pag.
50
pag.
55
pag. 57

Advertisement

Table of Contents
loading

This manual is also suitable for:

V 50

Table of Contents