Installing Top Cover; Installation - NEC Express5800/R120d-2E User Manual

Nec express server express5800 series
Hide thumbs Also See for Express5800/R120d-2E:
Table of Contents

Advertisement

Chapter 2 Preparations
1.19

Installing Top Cover

When all internal optional devices including DIMM and PCI card are installed, close the server with Top Cover.

1.19.1 Installation

1.
Put the top cover (rear) straight on the server chassis so that it can be surely engaged with the chassis
frame.
2.
Slide the top cover (rear) toward the front of the server.
3.
Tighten thumb nut on the rear panel.
4.
Put the top cover (front) straight on the server chassis so that it can be surely engaged with the chassis
frame.
5.
Slide the top cover (front) toward the rear of the server, until it is locked with clicking sound.
Important
To avoid damage to the cable, connect cables for PCI card such as LAN
cable after installing Top Cover.
Express5800/R120d-2E User's Guide
1. Installing Internal Optional Devices
111

Advertisement

Table of Contents
loading

Table of Contents