Chapter 2 Preparations
1. Installing Internal Options
1.14
Installing Top Cover
When all internal options are installed, close the server with Top Cover.
1. Put Top Cover straight on the server chassis so that it can be surely engaged with the chassis frame.
2. Slide Top Cover toward the front of the server.
3. Tighten Cap Screw on rear of the server.
Express5800/R120g-1E User's Guide
95