Quotation Specification; Delivery Options - REMEHA Gas 310 ECO Technical Information

High efficiency condensing boiler with low nox emission
Hide thumbs Also See for Gas 310 ECO:
Table of Contents

Advertisement

Insulation class
Other
Weight dry
Floor area
Noise level at a distance of 1 m
from the boiler (average)
Colour of casing
table 02 Technical data Remeha Gas 310 ECO

4.3 Quotation specification

- Cast aluminium - sectional pre-mix gas fired fully
condensing, modulating floor standing boiler
- Sectional heat exchanger manufactured from cast
aluminium
- Maximum operating pressure of 6 bar
- Maximum operating temperature of 90°C
- Ultra low NO
(max. 35 ppm at 0% O
X
- Pre-mix, fully modulating (20-100%) gas burner with
unique gas/ air ratio control for maximum efficiency
- Intelligent advanced boiler control 'abc
prehensive operating, service and fault diagnostic
facility
- No minimum flow requirement (see section 7.4.5)
- Available as conventional flue or room sealed opera-
tion
- Capable of remote BMS control (0 -10V modulating,
on/ off or high/ low option)
- Socket for advanced service diagnostics (for PC/ PDA
connection)
- Supplied fully factory assembled and tested
- Powder coated enamel steel casing BS; RAL colour:
2002 (red); 9023 (grey)
fig. 04
Installation options
04.31H.79.00004
I = Front (service side)
A = Short side (alternative orientation of the instrument
panel)
62560.indd 11
62560.indd 11
IP
kg
m
2
dB(A)
RAL
)
2
' c/w a com-
®
Gas 310 ECO
Execution 'left-hand'
360
410
1.2
1.2
2002 (red); 9023 (grey)
- Rigid steel box frame
- Suitable for use with Natural gas only
- Supplied as standard with on/ off switch, temperature
indication, flow, return, heat exchanger block and flue
gas sensors
- Supplied as standard with indicating module No. 1
lock-out indication (Volt free), shut down indication
(Volt free), boiler on indication (24 Volt AC)
- Efficiencies up to 109% (NCV/ Hi)
- Manufactured to ISO 9001
- CE approved

4.4 Delivery options

Available in 5 section sizes, in "left-hand" or "right-hand"
versions each with 2 instrument panel positions:
Gas 310 ECO
Execution 'right-hand'
11
20
460
510
560
1.4
1.4
1.4
60
18-6-2009 13:14:53
18-6-2009 13:14:53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents