Install Liners - Valor 1500IN (NG) Installation & Owner's Manual

L1 series
Table of Contents

Advertisement

QUALIFIED
INSTALLER

Install Liners

The liners install in the manner outline below.
For the enamel liners, an infi ll set will be needed
with less than 2'-0" vertical pipe rise in vent system—
see the installation instructions supplied with the
liners. Unpack the liner panels carefully.
1. Inside the fi rebox, on the top of each side, release
the screw of the side panel anchors (one per side)
just enough to allow them to rotate.
2. Remove the top panel support located in the center
of the fi rebox at the top edge (2 screws).
3. Place the rear panel, beveled edge on top, on the
ledge above the ports of the rear of the fi rebox. The
panel sits on the ledge behind the tabs.
4. Place the left
panel against
the left wall of
the fi rebox.
42
Installation
5. Place the right panel against the right wall of the
fi rebox.
6. Tighten the side panel anchors on each side of the
fi rebox.
7. Insert the top panel over the top
of one of the side panels as far as
possible. The bevel goes on the top
and straight edge fi re side.
Rotate the other end of the top panel
upwards and pull it back to rest on
the other side panel. Center the top
panel and push as far back as possible
to rest it on the rear panel.
NOTE: If the space is too tight, the top panel can be
installed before the right panel. In this case, install
the right panel last.
8. Reinstall the top panel support (2 screws).
top
underside
(fi re side)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1500ip (lpg)L1 series

Table of Contents