Replacing The Lnb - KVH Industries TracVision G8 Owner's Manual

Guide to operation, guide to technical information
Hide thumbs Also See for TracVision G8:
Table of Contents

Advertisement

3. Roll the belt over the motor hub, then over the pulley.
Remove and discard the old belt.
4. Place the new belt around the pulley and around the motor
hub. Ensure that the teeth are on the inside of the belt.
5. Slide the motor back until the belt is set at the proper
tension. Adjust the belt tension until the belt teeth fully
engage the motor hub and the pulley. Some readjustment
may be necessary if the belt tension results in excessive
vibration.
6. Once the belt is at the proper tension, tighten the motor's
four M3 cap screws.
7. Follow Steps 13 through 17 of the previous section.

5.17 Replacing the LNB

1. Using a
7
" wrench, carefully disconnect the RF cables
1 6
from the LNB.
Figure 5-32 LNB (Linear Quad Version Shown)
Reflector
#8-32 Set
Screws (x 2)
2. Using a
5
" allen key, loosen the two #8-32 set screws
6 4
securing the LNB in place. Remove the old LNB.
3. Install the new LNB and secure in place with the #8-32 set
screws.
4. Using a
7
" wrench, carefully reattach the RF cables that
1 6
you removed in Step 1.
54-0198
RF Cable
Connectors
LNB
Maintenance
117

Advertisement

Table of Contents
loading

Table of Contents