The clearances for the Zero Clearance Kit are 0" to combustibles (back, side and floor) but when planning your
installation review the clearances required for the Insert (see below) after it is installed in the Zero Clearance
Kit. The Zero Clearance Kit must be installed on a flat, solid, continuous surface (e.g. wood, metal, concrete).
This may be the floor, or raised up on a platform to enhance its visual impact.
NOTE: The specified '0' inch floor clearance means that the top surface of the flooring material, i.e. carpeting, tile, etc., must not extend
above the bottom edge of the 4" Hearth Trim.
From Unit
Sides
A
Drop Ceiling
B
Mantel*
C(My) 22" / 555 mm
From Surround
Sides
D
Drop Ceiling
E
Mantel Depth*
G(Mx)11.5" / 290 mm
Max. Alcove Depth H
Min. Alcove Width J
Facing (Mantel Leg)
Side**
K
Top
L
K
D
A
Top View
**Max. width of 1"(25mm) at 1"(25mm) from
surround, calculate depth at 45
diagram.
Page 46

CLEARANCES TO COMBUSTIBLES

Clearances to Combustibles for Insert
10" / 250 mm
47.5" / 1207 mm
2" / 50 mm
37.75" / 945 mm
36" / 882mm
48" / 1200 mm
1" / 25 mm
1" / 25 mm
45
K
Max.
K
o
as shown in the
* Mantel clearances vary with the width of the
mantel see the chart "Combustible Mantel Clear-
ances" on this page.
Note: A non-combustible mantel may be installed at a lower
height if the framing is made of metal studs covered with a
non-combustible board.
Side View
*Combustible Mantel Clearances
Depth (Mx)
(inches)
(mm)
0" to 3.5"
0mm to 89mm
to 5.5"
to 140mm
to 11.5"
to 292mm
Clearance (My)
(inches) (mm)
20"
508mm
21"
533mm
22"
559mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents