Masport Piccolo Installation Instructions Manual page 38

Table of Contents

Advertisement

Vertical Flueing with Two (2) 90
Option
V
A)
1' (305mm) Minimum
B)
2' (610mm) Minimum
C)
3' (914mm) Minimum
D)
4' (1.22m) Minimum
E)
5' (1.5m) Minimum
F)
6' (1.86m) Minimum
With the above options, maximum total pipe length if
37 feet with minimum of 6 feet total vertical and
maximum 17 feet total horizontal.
Please note minimum 305mm between 90
bows is required.
Diagram 9
Page 38
o
Elbows
H
4' (1.22m) Maximum
6' (1.86m) Maximum
9' (2.7m) Maximum
12' (3.6m) Maximum
15' (4.5m) Maximum
17' (5.1m) Maximum
o
el-
Vertical Flueing with Three (3) 90
Option
A)
B)
C)
D)
With the above options, maximum total pipe length is
37 feet with minimum of 5 feet total vertical and
maximum 12 feet total horizontal.
Please note minimum 305mm between 90
is required.
Diagram 11
Vertical Flueing with Two (2) 90
Option
V
A)
1' (305mm) Minimum
B)
2' (610mm) Minimum
C)
3' (914mm) Minimum
D)
4' (1.22m) Minimum
With the above options, maximum total pipe length
if 37 feet with minimum of 4 feet total vertical and
maximum 8 feet total horizontal.
Please note minimum 305mm between 90
elbows is required.
Diagram 10
o
Elbows
V + V1
2' (610mm) Min.
1' (305mm) Max.
3' (914mm) Min.
4' (1.22m) Max.
4' (1.22mm) Min.
6' (1.86m) Max.
5' (1.5m) Min.
8' (2.4m) Max.
o
Elbows
H + H1
2' (610mm) Maximum
4' (1.22m) Maximum
6' (1.86m) Maximum
8' (2.4m) Maximum
o
H
H + H1
2' (610mm) Max.
5' (1.5m) Max.
8' (2.4m) Max.
12' (3.6m) Max.
o
elbows

Hide quick links: