Masport Piccolo Installation Instructions Manual page 37

Table of Contents

Advertisement

FLUEING ARRANGEMENTS - VERTICAL TERMINATIONS
• Flue must be supported at offsets
• Maintain clearances to combustibles.
The Newport/Newport Pier is approved for a maximum 35 ft. (10.7m) straight vertical flue systems for Propane
and Natural Gas, as per diagram 7 below.
Straight Up Vertical Flueing
Diagram 7
Vertical Flueing with One (1) 90
Option
V
A)
1' (305mm) Minimum
B)
2' (610mm) Minimum
C)
3' (914mm) Minimum
D)
4' (1.22m) Minimum
With the above options, maximum total pipe length
if 37 feet with minimum of 4 feet total vertical and
maximum 8 feet total horizontal.
Please note minimum 305mm between 90
elbows is required.
Diagram 8
o
Elbow
H
2' (610mm) Maximum
4' (1.22m) Maximum
6' (1.86m) Maximum
8' (2.4m) Maximum
o
Page 37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents