HAMPTON BAY HG35-NG1 Owners & Installation page 11

Direct vent gas fireplace
Table of Contents

Advertisement

Flueing Arrangements -
Riser Flue Termination
Riser Terminations:
For installations requiring a vertical rise on the
exterior of the building, Riser Flue Terminations
as shown in Diagram below is available. Follow
the same installation procedures as used fo
rstandard Horizontal Termination.
NEVER install the Riser fl ue upside down.
NOTE:
For Riser terminatons in ABOVE grade
installations, follownational or local code
requirements.
Below Grade Riser Installation
If the Riser Termination must be installed below
grade, i.e. basement application, proper drain-
age must be provided to prevent water from
entering the Riser Termination. Do not attempt
to enclose the Riser within the wall, or any other
type of enclosure.
NOTE:
All joints shall be sealed with Mill-Pac.
Hampton HG35-1 Direct Vent Freestanding Gas Stove
Restrictor Positioin 'A'
Riser Flue Termination
Flueing Arrangements -
Straight Horizontal Termination
at a De-Rated BTU
Restrictor Positioin 'A'
Riser Flue Termination
INSTALLATION
*If this is an outside corner, the minimum
distance between the fl ue and the outside
corner is 6" (15cm). See "F" on the diagram
on page 9.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hg35-lpg1

Table of Contents