Dv Stove Horizontal Flue Kit; Dv Stove Horizontal Flue Kit Installation - HAMPTON BAY HG35-NG1 Owners & Installation

Direct vent gas fireplace
Table of Contents

Advertisement

DV 2 ft. Stove Flue Kit (Part # 946-116) and DV 4 ft. Stove Flue Kit (Part #946-216) includes all the
parts needed to install the HG35 Direct Vent unit with minimum horizontal and vertical fl ue dimensions.
For installations that require longer vertical and/or horizontal fl ue use the Dura-Vent system.
Qty.
Description
1) 1
Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length,
Kit # 946-216: 4 ft. (1.2m) length), 6-1/2" (165mm)
inside diameter
2) 1
Flex Liner, compressed aluminium 2 ply liner, 4" (102mm)
inside diameter
3) 4
spring spacers
4) 1
90 deg. Elbow
5) 1
Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pcs.
6) 1
Thimble Cover
7) 1
Wall Thimble (2 pcs.)
8) 1
Adapter
9) 1
AstroCap Termination Cap
10) 2
Trim Collars
11) 1
tube of Mill-Pac, high temperature sealant
12) 12
Screws, #8 x 1/2" Self tapping, Stainless Steel
13) 14
Screws, #8 x 1/2" Self tapping, Black
14) 4
Screws #8 x 1-1/2" Drill Point, Black
15) 4
Screws #8 x 1-1/2" Drill Point, Stainless Steel
16) 8
Wood screws #8 x 1"
Required but not included in above Kit:
45
o
Elbow (Part #: 946-214)
DV STOVE HORIZONTAL FLUE KIT (#946-116 & #946-216) INSTALLATION
Review the following sequence of instructions
which are typical of most installations. The
sequence may vary depending on wall thick-
ness. Refer to fl ue location and clearance
dimensions to set the Flue Restrictor to the
correct position.
1) Set the unit in its desired location. Check
to determine if wall studs will be in the way
of the fl ueing system, adjust location until
all clearances are met and there are no
obstructions.
Note: A 1-1/2"(38mm) clearance around the
outer pipe must be maintained except
that only a 1" (25mm) clearance is
needed at the termination end.
IMPORTANT:
Do not locate termination hood where
excessive snow or ice buildup may
occur. Be sure to check fl ue termina-
tion area after snow falls, and clear to
prevent accidental blockage of fl ueing
system. When using snow blowers,
make sure snow is not directed towards
fl ue termination area.
Hampton HG35-1 Direct Vent Freestanding Gas Stove

DV STOVE HORIZONTAL FLUE KIT

2) Assemble a trial fi t to determine the vertical
center-line for the fl ue termination.
a) Cut a 9-1/2" x 9-1/2" (241mm x 241
mm) square hole on both the interior
and exterior wall.
INSTALLATION
Note:
a) Liner sections should be continuous
without any joints or seams.
b) This is an approved system, there-
fore components in this system
must not be substituted for any other
manufacturer's products.
b) Install wall thimbles on both interior
and exterior wall with 4 wood screws
(#8 x 1") per thimble.
c) Attach the 2 piece adjustable pipe sec-
tion to the fl ue terminal and slide into
position from the exterior. The larger
diameter end of the adjustable pipe
goes to the fl ue terminal.
o
d) Install the 90
elbow onto the adjust-
able pipe to determine the vertical
centerline.
Note: if the centerline cannot be met,
the adjustable sections will have to
be cut.
e) Cut the 4 ft. section of rigid pipe to
length. Attach the 45
o
elbow to the rigid
pipe, and ensure that the pipe length
when cut (with the 45
o
elbow) will seat
onto both the starter collar and the 90
elbow. Crimped section of rigid pipe
o
seats into the 90
elbow. Only cut
the uncrimped side of pipe.
Dismantle all pipe sections including fl ue
terminal.
o
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hg35-lpg1

Table of Contents