Black Box LWN602A User Manual page 38

Smartpath enterprise wireless system
Hide thumbs Also See for LWN602A:
Table of Contents

Advertisement

Chapter 3: The SmartPath AP (LWN602HA) Overview
(worms's eye view with ceiling
Worm's eye view with ceiling
tiles removed for clarity)
tiles removed for clarity.
1
Press the track clips against the
ceiling track and swivel them until
they snap into place, gripping the
edges of the track.
If necessary, slide one or both of
the clips along the track to position
them at the proper distance (2 1/4"
or 7 cm) to fit through the holes in
the mounting plate.
2
Insert the mounting plate over the
screws attached to the track clips,
and use the Keps nuts to fasten
the plate firmly to the screws on
the clips.
Use a wrench to tighten the nuts
firmly to the bolts and secure the
plate to the track.
3
Through the oblong opening in the
plate, drill a hole in the ceiling tile (not
shown). Then pass one or both
Ethernet cables through the hole, and
if you plan to supply power from an
AC power source rather than through
PoE, pass the power cable through
as well.
Attach the SmartPath AP to the mounting plate and connect the cables, as shown in Figure 3-13.
NOTE: You can tie the cables to the tie points (small arched strips) on the mounting plate to prevent them from being pulled out
of their connections accidentally.
Page 38
Ceiling Track
2
"
1
4
Figure 3-12. Attaching the track clips and mounting plate to the ceiling track.
724-746-5500 | blackbox.com
Track Clip
2
" (7 cm)
1
2 1/4 " (7 cm)
4
Drill a hole in the ceiling tile
and feed cables through here.
Mounting Plate

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lwn602aeLwn602haLwn602hae

Table of Contents