L.
M.
9.
17.
Figure 48— Installing the Compressor Shell
19. Seal (31) and bushing (30) to the rear of the dis
charge cross-over tu be (26).
20. R ear suction reed (48) over the dowel pins (45).
• P lace the slot toward the sump.
21. R ear discharge valve plate (49) over the dowel pins
(45).
• P lace the reed retainer up.
22. Inner oil pum p gar (50) over the shaft (39).
• Line up the identification marks.
23. O uter oil pum p g ear (51) over the inner g ear (figure
50).
• Line up the identification marks.
• Face the com pressor oil sum p and position
the outer g ear (51) so that it m eshes with the
inner g ear (50) at the 9 o 'clock position. T h e
cavity betw een the g e a r teeth will be at the 3
o 'clock position.
24. Seal (52) to the d ischarge valve plate (49).
• Lubricate the seal (52), shell (9), discharge
plate (49) and gears (50 and 51) with 5 2 5 vis
cosity refrigerant oil.
25. Suction screen (58) to the rear head (54).
A-6 AIR CONDITIONING COMPRESSOR 1B1-21
F -01393