6A2-24 2.8 LITER V-6
A. Apply Sealer Here
35. Bolts
36. Bolts
37. Reinforcements
38. N u ts
Figure 38—Oil Pan Installation
T ighten
All bolts to 55 N-m (40 ft. lbs.), using the
sequence shown in figure 39.
In
sequence, tig h te n all bolts an additional
degrees (1 /4-turn).
Figure 40— Rocker Arms and Pushrods
VALVE TRAIN COMPONENT
If lifter replacement is necessary, use new lifters with a
narrow flat along the lower
provides additional oil to the cam lobe and lifter surfaces.
F-05902
Im portant
Replace all hydraulic lifters if a new camshaft was
installed.
-►+ Install or C onnect (Figure 40)
90
• Lubricate the hydraulic lifter bodies and feet with
Engine Oil Supplement (GM Part No. 1051396 or
equivalent).
1. Hydraulic lifters (10) to the block.
2. Pushrods (9).
• Seat the pushrods into the socket in the
• Coat the mating surfaces of the rocker arms (7) and
balls (8) with " Molykote" or equivalent.
3. Rocker arms.
4. Balls (8).
5. Nuts (6).
INSTALLATION
of the body length. This
3U
hydraulic lifters.