GMC 1989 Light Duty Truck Repair Manual page 226

Unit repair manual
Table of Contents

Advertisement

2
4B6-8 1
-INCH RING GEAR (ROCKWELL)
3. Cage bolts (56).
&
Tighten
• Bolts to 48 N-m (35 ft. lbs.).
DIFFERENTIAL CASE ASSEMBLY
Install or C onnect
• Lubricate all parts with rear axle lubricant.
1. Differential pinion gears (41) and thrust washers (42)
to the spider (40) (figure 21).
2. Differential side gears (43) and thrust washers (38)
to the differential case halves in their original
locations.
3. Differential spider (40) to the differential.
4. The case halves (figure 22).
• Align the scribe marks on the case halves.
5. Case bolts (44).
Figure 2 2 — Installing the Case Halves
&
T ighten
• Bolts (44) to 61 N m (45 ft. lbs).
• Check that the mating surfaces of the differential
case and the ring gear are clean and burr free.
• The ring gear must be heated before assembly to
the differential case. Heat the ring gear in water to
160° — 180° F for 10 minutes before assembly.
6. Ring gear (37) to the differential.
• T hread tw o stu ds into the ring gear on
opposite sides.
• Place the ring gear onto the case, and align
the holes in the c ase with the studs.
7. New ring gear bolts (44).
• Tighten the ring gear bolts alternately in
stages gradually pulling the ring gear onto the
differential case.
T ighten
• The ring gear bolts in sequence to 136 N-m
(100 ft. lbs.).
8. Differential side bearings (33).
Figure 2 4 — Installing the B earing Cup

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents