Changing Background Activity Schedule - G-Technology G SPEED STUDIO XL Product Manual

Hardware raid 8-bay thunderbolt 2 storage solution
Table of Contents

Advertisement

G SPEED
STUDIO
with Thunderbolt™
Choose an End On option:
• No end date or perpetual
• End after a specific number of activity actions
• Run until date from the drop-down menus
For Redundancy Check, choose:
• Auto Fix option – Attempts to repair the problem when it finds an error. Check to enable.
• Pause on Error option – The process stops when it finds a non-repairable error. Check to enable.
• Select LD – Check the boxes for which logical drives should run the redundancy check.
Check at least one logical drive.
Click the Save button.
To return to currently running background activities, click the Background Activities button.

Changing Background Activity Schedule

To change an existing scheduled background activity:
1. Click on the Background Activities icon.
2. Click the Scheduler button. The list of scheduled background activities will appear.
3. Mouse-over the background activity, then click the Settings button.
4. Make settings as needed.
Choose the option for the activity you want:
• Media Patrol
• Redundancy Check
• Spare Check
Configuring G-SPEED Studio XL
XL
p. 45

Advertisement

Table of Contents
loading

This manual is also suitable for:

G speed studio xl with thunderbolt

Table of Contents